|
Monday April 20, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 7:00 PM
|
Softball Game
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
5:00 PM - 7:00 PM
|
Unlimited Arc Softball
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Tuesday April 21, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
10:00 AM - 2:00 PM
|
HOLD for MESA Meeting
|
Bucky Boyle Park - Pavilion
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Wednesday April 22, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
1:30 PM - 3:30 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Thursday April 23, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Friday April 24, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Saturday April 25, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
9:00 AM - 12:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #3 Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #2 Pavilion
|
|
|
|
11:00 AM - 4:00 PM
|
St Luke's Youth Run
|
Special Event Permit Application Small Scale (Under 999)
|
|
|
|
11:00 AM - 4:00 PM
|
St Luke's Youth Run
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
1:00 PM - 4:00 PM
|
Adult Softball
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Sunday April 26, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 2:00 PM
|
5K & Half Marathon
|
Special Event Permit Application Large Sale (1000+)
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
9:00 AM - 3:00 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #3 Pavilion
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Monday April 27, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 7:00 PM
|
Softball Game
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
5:00 PM - 7:00 PM
|
Unlimited Arc Softball
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Tuesday April 28, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Wednesday April 29, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
1:30 PM - 3:30 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Thursday April 30, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #1 Pavilion
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Friday May 1, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Saturday May 2, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
9:00 AM - 12:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #1 Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace Picnic Grove
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Pavilion
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Sunday May 3, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
8:00 AM - 8:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 4
|
|
|
|
9:00 AM - 3:00 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Monday May 4, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 7:00 PM
|
Softball Game
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
5:00 PM - 7:00 PM
|
Unlimited Arc Softball
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Tuesday May 5, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Wednesday May 6, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
1:30 PM - 3:30 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
4:00 PM - 5:00 PM
|
Allentown Youth Golf 2026 - Youth Golf The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026
|
Allentown Municipal Golf Course
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
6:00 PM - 7:30 PM
|
Summer Series 5K
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Thursday May 7, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
10:00 AM - 12:30 PM
|
America250PA Lehigh County Liberty Bell Ceremony
|
Special Event Permit Application Small Scale (Under 999)
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Friday May 8, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Saturday May 9, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
7:00 AM - 12:00 PM
|
To host a 5K and 5Mile Run
|
Special Event Permit Application Small Scale (Under 999)
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
8:00 AM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
9:00 AM - 12:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
10:00 AM - 11:00 AM
|
Fitness in the Park Series - Dance Fitness in the Park: Session 1 Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
|
West Park
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Bucky Boyle Park - Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Percy Ruhe - Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #1 Pavilion
|
|
|
|
12:00 PM - 6:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 1
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Sunday May 10, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
9:00 AM - 3:00 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
12:00 PM - 3:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Monday May 11, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 3:15 PM
|
field day
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
8:00 AM - 3:15 PM
|
RESERVED
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 7:00 PM
|
Softball Game
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
5:00 PM - 7:00 PM
|
Unlimited Arc Softball
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Tuesday May 12, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:00 PM
|
Fitness in the Park Series - Walking in the Park: Session 1 Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
|
Li'l-Le-Hi Trout Nursery
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Wednesday May 13, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #2 Pavilion
|
|
|
|
1:30 PM - 3:30 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
4:00 PM - 5:00 PM
|
Allentown Youth Golf 2026 - Youth Golf The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026
|
Allentown Municipal Golf Course
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Thursday May 14, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Friday May 15, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 3:15 PM
|
RESERVED
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
8:00 AM - 3:15 PM
|
RESERVED
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
2:00 PM - 10:00 PM
|
Bomba at the beach
|
Band Trailer/Stage Application
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:00 PM - 9:00 PM
|
Bomba at the beach
|
Special Event Permit Application Small Scale (Under 999)
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Saturday May 16, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 12:00 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
8:00 AM - 8:00 PM
|
RESERVED
|
Percy Ruhe
|
|
|
|
9:00 AM - 12:00 PM
|
Mental Health Walk
|
Special Event Permit Application Small Scale (Under 999)
|
|
|
|
10:00 AM - 7:00 PM
|
HOLD - ANDREW PETRUCCELLI
|
South Mountain Reservoir - Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #2 Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #1 Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #3 Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Bucky Boyle Park - Pavilion
|
|
|
|
2:00 PM - 10:00 PM
|
Bomba at the beach
|
Band Trailer/Stage Application
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Sunday May 17, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
8:00 AM - 5:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
8:00 AM - 8:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 4
|
|
|
|
8:00 AM - 8:00 PM
|
RESERVED
|
Percy Ruhe
|
|
|
|
9:00 AM - 3:00 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #2 Pavilion
|
|
|
|
1:00 PM - 7:00 PM
|
Fiesta on Hamilton
|
Band Trailer/Stage Application
|
|
|
|
1:00 PM - 7:00 PM
|
Fiesta on Hamilton
|
Special Event Permit Application Large Sale (1000+)
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
Monday May 18, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 7:00 PM
|
Softball Game
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
5:00 PM - 7:00 PM
|
Unlimited Arc Softball
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Tuesday May 19, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
3:00 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 1
|
|
|
|
3:30 PM - 6:00 PM
|
RESERVED
|
Fountain Park - Fountain Field 3
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
|
|
|
|
5:00 PM - 8:00 PM
|
RESERVED
|
Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
|
|
|
|
5:30 PM - 6:30 PM
|
Fitness in the Park Series - Yoga in the Park: Session 1 Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
|
Arts Park
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
5:30 PM - 8:30 PM
|
RESERVED
|
Percy Ruhe - Percy Ruhe - Field 2
|
|
|
|
6:00 PM - 7:30 PM
|
Reserved
|
Lehigh Parkway - Lehigh Parkway - Cross Country Course
|
|
|
|
6:00 PM - 8:00 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 3
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|
|
Wednesday May 20, 2026
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Bogerts Bridge Construction Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Lehigh Parkway
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 1
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 2
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 3
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Improvements - Irving Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Andre Reed Park - Andre Reed Pickleball/Tennis 4
|
|
|
|
12:00 AM - 11:59 PM
|
Capital Project Updates - Court Resurfacing - Walden Terrace Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025.Overview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Public Meetings: 2/26/26 - 6-8pm, 3/21/26 - 1-3pm, 4/30/26 - 6-8pmProject Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings starting Spring 2026.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Completed ProjectsProject Name: Parks Master PlanFinal Plan Adopted 2/4/2026Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
|
Walden Terrace Playlot
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Jordan Park - Pavilion
|
|
|
|
10:00 AM - 7:00 PM
|
RESERVED
|
Cedar Creek Parkway - Rose Garden #2 Pavilion
|
|
|
|
1:30 PM - 3:30 PM
|
RESERVED
|
Fountain Park - Fountain Field 2
|
|
|
|
3:00 PM - 5:30 PM
|
Harrison Morton MS Baseball
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
4:00 PM - 5:00 PM
|
Allentown Youth Golf 2026 - Youth Golf The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026
|
Allentown Municipal Golf Course
|
|
|
|
4:00 PM - 8:00 PM
|
RESERVED
|
Jordan Park - Jordan Park Field 1
|
|
|
|
4:30 PM - 7:30 PM
|
RESERVED
|
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Roosevelt Park - Roosevelt Park - Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 1
|
|
|
|
5:30 PM - 8:00 PM
|
Reserved
|
Bucky Boyle Park - Bucky Boyle Field 2
|
|
|
|
5:30 PM - 8:00 PM
|
RESERVED
|
Keck Park - Keck Park Field 2
|
|
|
|
5:30 PM - 8:30 PM
|
Reserved
|
Percy Ruhe - Percy Ruhe - Field 1
|
|
|
|
6:00 PM - 8:00 PM
|
RESERVED
|
Andre Reed Park - Andre Reed Field 2
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 1
|
|
|
|
6:01 PM - 8:00 PM
|
Reserved
|
Fountain Park - Fountain Field 2
|
|
|