Return to Site | View Calendar | Mobile Version

to   


Tuesday May 19, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
3:00 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 2
 
3:30 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 1
 
3:30 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 6:30 PM    Fitness in the Park Series - Yoga in the Park: Session 1
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Arts Park
 
5:30 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:30 PM    Reserved Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Wednesday May 20, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
1:30 PM - 3:30 PM    RESERVED Fountain Park - Fountain Field 2
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 5:00 PM    Allentown Youth Golf 2026 - Youth Golf
The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026 
Allentown Municipal Golf Course
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Thursday May 21, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 4:30 PM    Public Works Jovan Saba (610) 437-7650 x2250 Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
3:00 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 2
 
3:30 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 1
 
3:30 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:30 PM    Reserved Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Friday May 22, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
7:00 AM - 3:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
7:00 AM - 3:00 PM    RESERVED Jordan Park - Jordan Park Basketball 2
 
7:00 AM - 3:00 PM    RESERVED Jordan Park - Jordan Park Basketball 1
 
7:00 AM - 3:00 PM    RESERVED Jordan Park - Jordan Park Field 3
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
1:00 PM - 10:30 PM    Concert Series in partnership with the City of Allentown Band Trailer/Stage Application
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
3:00 PM - 6:00 PM    RESERVED Fountain Park - Fountain Field 2
 
3:30 PM - 6:30 PM    Irving Block Party Special Event Permit Application Small Scale (Under 999)
 
3:30 PM - 6:30 PM    Irving Block Party Andre Reed Park
 
4:00 PM - 6:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:00 PM - 10:00 PM    Cedar Crest College's Mayfair Special Event Permit Application Large Sale (1000+)
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:00 PM - 9:00 PM    Concert Series in partnership with the City of Allentown Special Event Permit Application Small Scale (Under 999)
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
6:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Saturday May 23, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
9:00 AM - 12:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
9:00 AM - 5:00 PM    Filming - Steve Brosky Living in Allentown Special Event Permit Application Small Scale (Under 999)
 
9:00 AM - 5:00 PM    Filming - Steve Brosky Living in Allentown West Park
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
12:00 PM - 6:00 PM    RESERVED Keck Park - Keck Park Field 1
 
12:00 PM - 7:00 PM    RESERVED South Mountain Reservoir - Pavilion
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:00 PM - 10:00 PM    Cedar Crest College's Mayfair Special Event Permit Application Large Sale (1000+)
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Sunday May 24, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
8:00 AM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
9:00 AM - 3:00 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
9:00 AM - 5:00 PM    Filming - Steve Brosky Living in Allentown Special Event Permit Application Small Scale (Under 999)
 
9:00 AM - 5:00 PM    Filming - Steve Brosky Living in Allentown West Park
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Percy Ruhe - Pavilion
 
12:00 PM - 3:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 2
 
12:00 PM - 3:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 1
 
4:00 PM - 10:00 PM    Cedar Crest College's Mayfair Special Event Permit Application Large Sale (1000+)
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Monday May 25, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    Reserved Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    Reserved Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Tuesday May 26, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
10:00 AM - 7:00 PM    Field trip Cedar Creek Parkway - Cedar Beach Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 7:00 PM    RESERVED Fountain Park - Fountain Field 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 6:30 PM    Fitness in the Park Series - Dance Fitness in the Park: Session 2
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace Amphitheatre
 
5:30 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:30 PM    Reserved Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Wednesday May 27, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 5:00 PM    Allentown Youth Golf 2026 - Youth Golf
The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026 
Allentown Municipal Golf Course
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Thursday May 28, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:30 PM    Reserved Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Friday May 29, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 2:00 PM    Raub M.S. Block Party Special Event Permit Application Small Scale (Under 999)
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 1
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 2
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 3
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Handball 1
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Handball 2
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Basketball 1
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 1
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 2
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 3
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 4
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
9:00 AM - 3:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
3:00 PM - 5:30 PM    Harrison Morton MS Baseball Bucky Boyle Park - Bucky Boyle Field 1
 
4:00 PM - 6:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Saturday May 30, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
9:00 AM - 12:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
9:00 AM - 7:00 PM    Community Bike Works Pop-up Bike Repair Day Special Event Permit Application Small Scale (Under 999)
 
9:30 AM - 5:00 PM    Humankind Day Special Event Permit Application Small Scale (Under 999)
 
10:00 AM - 7:00 PM    Humankind Day Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
11:00 AM - 12:00 PM    Fitness in the Park Series - Yoga in the Park: Session 2
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Malcolm Gross Rose Garden
 
11:00 AM - 2:00 PM    Families First in Franklin Park Spring Carnival Special Event Permit Application Small Scale (Under 999)
 
11:00 AM - 2:00 PM    Families First in Franklin Park Spring Carnival Franklin Park
 
12:00 PM - 3:00 PM    Humankind Day Special Event Permit Application Small Scale (Under 999)
 
12:00 PM - 6:00 PM    RESERVED Keck Park - Keck Park Field 1
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Sunday May 31, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Resurfacing - Walden Terrace
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Walden Terrace Playlot
 
8:00 AM - 11:00 AM    3rd Annual Sanctuary at Haafsville 5K Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
8:00 AM - 8:00 PM    RESERVED Fountain Park - Fountain Field 4
 
9:00 AM - 3:00 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
9:00 AM - 7:00 PM    Basketball Games Cedar Creek Parkway - Cedar Beach Basketball 3
 
10:00 AM - 7:00 PM    Birthday celebration South Mountain Reservoir - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
12:00 PM - 3:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 1
 
12:00 PM - 3:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
1:00 PM - 3:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Monday June 1, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 1
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 2
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 4
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Basketball 3
 
9:00 AM - 2:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
2:00 PM - 4:30 PM    Health Bureau Car Seat Checks Cedar Creek Parkway - Cedar Beach Pavilion
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 7:00 PM    Softball Game Percy Ruhe - Percy Ruhe - Field 2
 
5:00 PM - 7:00 PM    Unlimited Arc Softball Percy Ruhe - Percy Ruhe - Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Tuesday June 2, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:00 PM    Fitness in the Park Series - Pilates in the Park: Session 2
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Malcolm Gross Rose Garden
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Wednesday June 3, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 2:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Basketball 2
 
8:00 AM - 2:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Basketball 1
 
8:00 AM - 2:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 2
 
8:00 AM - 2:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 1
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 5:30 PM    Allentown Youth Golf 2026 - Youth Golf
The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026 
Allentown Municipal Golf Course
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 7:30 PM    Summer Series 5K Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Thursday June 4, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Basketball 1
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 1
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 2
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Field 3
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Handball 1
 
8:00 AM - 3:00 PM    RESERVED Keck Park - Keck Park Handball 2
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Field 3
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Basketball 1
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Basketball 2
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Field 1
 
10:00 AM - 7:00 PM    5th grade end of year picnoc Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
12:00 PM - 3:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 1
 
12:00 PM - 3:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 2
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:00 PM - 10:00 PM    Washingon Elementary School Block Party Block Party Permit Application
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:00 PM - 8:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 3
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Friday June 5, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
7:00 AM - 3:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 2
 
7:00 AM - 3:00 PM    RESERVED Bucky Boyle Park - Bucky Boyle Field 1
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 6:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Saturday June 6, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 12:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Basketball 1
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
8:00 AM - 6:00 PM    2026 Lehigh Valley Children's Festival Band Trailer/Stage Application
 
8:00 AM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
9:00 AM - 10:00 AM    Fitness in the Park Series - Dance Fitness in the Park: Session 3
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
West Park
 
10:00 AM - 7:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Percy Ruhe - Pavilion
 
10:00 AM - 7:00 PM    RESERVED South Mountain Reservoir - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
11:00 AM - 4:00 PM    Community Celebration Special Event Permit Application Small Scale (Under 999)
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Special Event Permit Application Small Scale (Under 999)
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Basketball 1
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Basketball 2
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Field 1
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Field 2
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Sunday June 7, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 12:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Basketball 1
 
8:00 AM - 4:00 PM    Sixth Street Shelter Day Block Party Special Event Permit Application Small Scale (Under 999)
 
8:00 AM - 8:00 PM    RESERVED Fountain Park - Fountain Field 4
 
9:00 AM - 3:00 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
9:00 AM - 9:00 PM    Juneteenth Flag Football tournament Special Event Permit Application Small Scale (Under 999)
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
12:00 PM - 3:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
12:00 PM - 3:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 1
 
1:00 PM - 3:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Monday June 8, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Basketball 1
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Field 3
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Basketball 2
 
9:45 AM - 2:30 PM    RESERVED Jordan Park - Jordan Park Field 1
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 7:00 PM    Softball Game Percy Ruhe - Percy Ruhe - Field 2
 
5:00 PM - 7:00 PM    Unlimited Arc Softball Percy Ruhe - Percy Ruhe - Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Tuesday June 9, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 6:30 PM    Fitness in the Park Series - Yoga in the Park: Session 3
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Arts Park
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Wednesday June 10, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
7:00 AM - 5:00 PM    RESERVED Band Trailer/Stage Application
 
9:15 AM - 11:20 AM    RESERVED Keck Park - Keck Park Basketball 1
 
9:30 AM - 12:00 PM    RESERVED Keck Park - Keck Park Field 2
 
9:30 AM - 12:00 PM    RESERVED Keck Park - Keck Park Field 3
 
9:30 AM - 12:00 PM    RESERVED Keck Park - Keck Park Field 1
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 5:30 PM    Allentown Youth Golf 2026 - Youth Golf
The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026 
Allentown Municipal Golf Course
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:30 PM    Reserved Percy Ruhe - Percy Ruhe - Field 1
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Thursday June 11, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Friday June 12, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
2:00 PM - 10:00 PM    Bomba at the beach Band Trailer/Stage Application
 
4:00 PM - 6:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
4:30 PM - 7:30 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
5:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Keck Park - Keck Park Field 2
 
6:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
6:00 PM - 8:00 PM    RESERVED Andre Reed Park - Andre Reed Field 2
 
6:00 PM - 9:00 PM    Bomba at the beach Special Event Permit Application Small Scale (Under 999)
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Saturday June 13, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 12:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Basketball 1
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
10:00 AM - 7:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED South Mountain Reservoir - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Keck Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace Picnic Grove
 
12:00 PM - 8:00 PM    Blues, Brews, and Barbecue Band Trailer/Stage Application
 
12:00 PM - 8:00 PM    Blues, Brews, and Barbecue Special Event Permit Application Large Sale (1000+)
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Special Event Permit Application Small Scale (Under 999)
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Basketball 1
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Basketball 2
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Field 1
 
1:00 PM - 5:00 PM    2026 Lehigh Valley Children's Festival Bucky Boyle Park - Bucky Boyle Field 2
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Sunday June 14, 2026
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
8:00 AM - 12:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Basketball 1
 
8:00 AM - 5:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
8:00 AM - 8:00 PM    RESERVED Fountain Park - Fountain Field 4
 
9:00 AM - 3:00 PM    RESERVED Union Terrace at Joesph S. Daddona Lake and Terrace - Union Terrace - Field 1
 
10:00 AM - 7:00 PM    Graduation Party Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 7:00 PM    RESERVED Bucky Boyle Park - Pavilion
 
10:00 AM - 7:00 PM    Reserved Jordan Park - Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #1 Pavilion
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #3 Pavilion
 
12:00 PM - 3:00 PM    Reserved Percy Ruhe - Percy Ruhe - Field 1
 
12:00 PM - 5:00 PM    Community event Special Event Permit Application Small Scale (Under 999)
 
1:00 PM - 3:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
Monday June 15, 2026
12:00 AM - 11:59 PM    Tree Climbing School Cedar Creek Parkway - Cedar Beach Pavilion
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 7:00 PM    Softball Game Percy Ruhe - Percy Ruhe - Field 2
 
5:00 PM - 7:00 PM    Unlimited Arc Softball Percy Ruhe - Percy Ruhe - Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Tuesday June 16, 2026
12:00 AM - 11:59 PM    Juneteenth Conference - Resurrected Life / POWER Interfaith Arts Park
 
12:00 AM - 11:59 PM    Tree Climbing School Cedar Creek Parkway - Cedar Beach Pavilion
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:00 PM - 7:00 PM    Fitness in the Park Series - Walking in the Park: Session 3
Get ready to move, groove, and feel your best all summer long! The City of Allentown is excited to introduce Fitness in the Parks, a free community fitness series running from May 9 through September 26 in multiple city parks.This high-energy and welcoming program features a variety of fitness opportunities including Yoga, Pilates, Dance Fitness, and Walking sessions, giving participants the chance to mix things up and stay active in a fun, supportive environment. Whether you’re looking to relax and reset, build strength, or get your heart pumping, there’s something for everyone.Each class is led by a rotating lineup of talented local fitness instructors, bringing their own unique style, energy, and expertise to every session. It’s a great way to experience different workouts, connect with instructors in the community, and find what moves you.Classes take place on Tuesdays and Saturdays throughout the summer, making it easy to build a routine or drop in whenever it works for you. All fitness levels are welcome—no experience needed!Program Details:Dates: May 9 – September 26Days: Tuesdays & SaturdaysLocation: Multiple City ParksCost: FreeRegistration: Pre-registration is encouragedWhat to Bring: Water bottle and yoga mat or any equipment you needCome out, get active, and enjoy fitness in the fresh air—we can’t wait to see you moving and grooving in Allentown!
Li'l-Le-Hi Trout Nursery
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Wednesday June 17, 2026
12:00 AM - 11:59 PM    Juneteenth Conference - Resurrected Life / POWER Interfaith Arts Park
 
12:00 AM - 11:59 PM    Tree Climbing School Cedar Creek Parkway - Cedar Beach Pavilion
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 5:30 PM    Allentown Youth Golf 2026 - Youth Golf
The City of Allentown has an exciting new opportunity for our Allentown Youth in grades 6th – 8th . We are launching a free golf program designed to introduce students to the game while also providing meaningful mentorship and personal growth experiences.Golf is considered a low-impact sport that supports lifelong physical and mental wellness. Participation can help increase endorphins, reduce stress, promote better sleep, and improve confidence, self-esteem, and anxiety levels. Beyond learning the fundamentals of the sport, students will benefit from positive role models, teamwork, and a supportive environment.This program will take place at Allentown Municipal Golf Course. The instructor will be Allentown Muni Pro Jeff Wambold. Equipment will be provided for the children.Registration Deadline: April 25th, 2026 3pm (Space is limited!)Schedule:Start Date: May 6th, 4pm- Every Wednesday 4pm-5pm in May- Every Wednesday 4pm-5:30pm in June Last Day: June 24th, 2026 
Allentown Municipal Golf Course
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Thursday June 18, 2026
12:00 AM - 11:59 PM    Juneteenth Conference - Resurrected Life / POWER Interfaith Arts Park
 
12:00 AM - 11:59 PM    Tree Climbing School Cedar Creek Parkway - Cedar Beach Pavilion
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
10:00 AM - 7:00 PM    RESERVED Cedar Creek Parkway - Rose Garden #2 Pavilion
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
5:00 PM - 8:00 PM    RESERVED Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 1
 
5:30 PM - 8:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Field 2
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2
 
Friday June 19, 2026
12:00 AM - 11:59 PM    Juneteenth Conference - Resurrected Life / POWER Interfaith Arts Park
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 1
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 2
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 3
 
12:00 AM - 11:59 PM    Capital Project Updates - Court Improvements - Irving
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Please note all dates are estimates and subject to change. Current & Upcoming Projects Project Name: Franklin Park DesignDates: Design started December 2025 and will continue through 2026 with construction to follow. LocationOverview: This project includes the design of Franklin Park. A consultant has been selected and 3 public meetings have been held in February, March, and April 2026.  Project is in the design/permitting phase.Project Name:Resurfacing Projects Dates: Construction ongoing throughout 2026 SummerOverview: This project includes resurfacing courts at  Trout Creek, Irving Tennis Courts,  Walden, Keck, Roosevelt, Fountain.Project Name: Canal Park Concept PlanDates: Planning Currently UnderwayLocationOverview: This project includes the repair of the boat launch and a concept study to look at improving trail access, signage, and emergency access.  Public meetings TBD in summer 2026.Project Name: Park Operations FacilityDates: Concept complete, Design to start summer 2026, Construction 2027-2028LocationOverview: This project reviewed the existing facility that houses parks maint. staff  that does not meeting the needs of the department and received a grade of "D".  The concept plan is to build a new building to safely  house all parks employees in Lehigh Parkway just north of the existing facility.  Full design and permitting to begin summer 2026 with construction in 2027. Project Name: D&L Trail Design and constructionDates: Currently in the Design Phase, construction in 2027Location: From HERE  to HEREOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car. Construction planned for late 2026-early 2027Project Name: MLK Trail DesignDates: Phase 1 (Fountain Park to Lehigh Parkway) fully funded, planned to start construction in 2026.  Phase 2a (Union Terrace to Cedar Parkway) in the Design Phase, Phase 3 (Parkettes to Riverside Drive) in the concept phase. 2B (Parkway to UT)- TBDOverview: This is a multi-year project and is a phased project that will eventually connect the downtown to Fountain Park, Lehigh Parkway, Union Terrace, to Cedar Beach.Project Name: Bogert's Bridge RehabilitationLocationDates: Construction has started September 15th, 2025. Anticipated completion late 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025 and go through 2027.LocationOverview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition. New pavilion constructed in Fall 2025 near the playground and basketball courts. New lights were added to the court.  Project Name: Ithaca ParkDates: Improvements to start Fall 2026 through Spring 2027LocationOverview: This project includes improvements to the play structure, signage to access S. Mountain, shade for summer playground kids, and resurfacing of the court. Project Name: Fountain ParkDates: Ongoing.LocationOverview: This project includes the installation of a mural in 2025 and another planned for 2026. Plans to install a bathroom are underway as well as plans for design.Project Name: West ParkDates: Complete improvements in Summer 2026LocationOverview: This project includes improvements to the window and doors in the bandshell. Project Name: Clyde Bosket (Valania) History  SignDates: Install sign Summer 2026LocationOverview: Designer selected, sign to be installed in 2026.Project Name: Trexler MonumentDates: Construction throughout 2026LocationOverview: Piers and Wall completed. Surface stonework to be completed by Fall 2026Project Name: Urban ForestryDates: Master Plan started in September 2025 throughout 2026. Tree Plantings starting Spring 2026 and will continue for 3 years.  Tree inventory and Species selection plans completed.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: WPA Lehigh Parkway StairsDates: 2026-2027 Construction.LocationOverview:  Major Masonry work in Lehigh Parkway to fix the crumbling stairs leading to the parkway wall.  Some funding will be used to design the next WPA project (Cedar Ponds).Project Name: Public Art RestorationDates: Ongoing.Throughout the parks and public spaces. Overview:  Ongoing restoration on public art throughout the parks system.Completed Projects2026 Projects (as of 5.1.26)Project Name: Soccer Mini-Pitch at Jordan ParkDates: Completed June 2026LocationOverview: This project includes installation of a new soccer playing area in the unused parking lot in Jordan Park.  Funded through US soccer to support world cup activities. Project Name: Parks Master PlanFinal Plan Adopted 2/4/2026  https://www.allentownpa.gov/en-us/ParksPlan Project Name: Rose Garden Improvements: Dates: Completed in 2026Location   Overview: This project was a multi-year project that included major repairs to the stone stairs, a new metal gateway sign, roof repairs to the gazebos and 2 new pavilions installed in Rose Garden Grove.  Same year the park was awarded the "Best Park in the Valley"2025 Projects: Project Name: Jordan Park Skatepark Phase 2Dates: Phase 2 construction completed in 2025Location   Overview: This project completes the Jordan Skatepark project.  It provides a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. Project Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.LocationOverview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Soccer Mini Pitch at Jordan MeadowsCompleted April 29th, 2025.LocationOverview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.Project Name: WPA Union Terrace Stairs, Stage and Column Repair. Dates: Completed in 2025LocationOverview:  Major Masonry work in Union Terrace to preserve historic structures. Completed just in time for the summer concert series. Project Name: Stevens Park Full Size Basketball CourtCompleted July 18th, 2025.LocationOverview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project provided a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park offers  more opportunities for the community to engage. 2024 Projects: Project Name: Irving Pool at Andre Reed Park New ConstructionDates: Completed in May 2024 (Memorial Day)LocationOverview:  New zero depth entry pool constructed.Project Name: Cedar Beach ImprovementsDates: Completed in Summer 2024 LocationOverview:  Court resurfacing, new lighting and backboards, courtside speakers. Project Name: Bucky Boyle ImprovementsDates: Completed in 2024LocationOverview:  Court Resurfacing, new lighting, new fencing. Project Name: Fish Hatchery Maint. Building. Dates: Completed in 2024Location Overview:  New building to keep equipment separate to combat mud snail. 2023 Projects: Project Name: Clyde Bosket (Valania) Park Full RenovationDates: Completed in 2023LocationOverview:  Full Park Renovation with restrooms, basketball court and spray pad.  Project Name: WPA Parkway Wall Repairs. Dates: Completed in 2023LocationOverview:  Major Masonry work in Lehigh Parkway. Project Name: Percy Rue Master Plan Dates: Completed in 2023LocationProject Name: Cedar Bridge RepairLocation: Dates: Completed in 2023Overview: construction to bridge to allow for safe pedestrian and maint vehicle travel. 
Andre Reed Park - Andre Reed Pickleball/Tennis 4
 
10:00 AM - 7:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Pavilion
 
10:00 AM - 10:00 PM    Juneteenth Celebration Special Event Permit Application Large Sale (1000+)
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Basketball 1
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Basketball 2
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Basketball 3
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Basketball 4
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Hard Volleyball 1
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Hard Volleyball 2
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Sand Volleyball 1
 
10:00 AM - 10:00 PM    Juneteenth Celebration Cedar Creek Parkway - Cedar Beach Sand Volleyball 2
 
4:00 PM - 6:00 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
4:00 PM - 8:00 PM    RESERVED Jordan Park - Jordan Park Field 1
 
5:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 2
 
5:30 PM - 8:00 PM    RESERVED Roosevelt Park - Roosevelt Park - Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 1
 
5:30 PM - 8:00 PM    Reserved Bucky Boyle Park - Bucky Boyle Field 2
 
6:00 PM - 7:30 PM    RESERVED Percy Ruhe - Percy Ruhe - Basketball 3
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 1
 
6:01 PM - 8:00 PM    Reserved Fountain Park - Fountain Field 2