Return to Site | View Calendar | Mobile Version

to   


Monday November 3, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Tuesday November 4, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Wednesday November 5, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Thursday November 6, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Friday November 7, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Saturday November 8, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Sunday November 9, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Monday November 10, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Tuesday November 11, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Wednesday November 12, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Thursday November 13, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Friday November 14, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Saturday November 15, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Sunday November 16, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Monday November 17, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Tuesday November 18, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Wednesday November 19, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Thursday November 20, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Friday November 21, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Saturday November 22, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Sunday November 23, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Monday November 24, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Tuesday November 25, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Wednesday November 26, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
7:00 PM - 9:00 PM    Lights in the Parkway 5K Lehigh Parkway - Lehigh Parkway - Cross Country Course
 
Thursday November 27, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Friday November 28, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Saturday November 29, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Sunday November 30, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Monday December 1, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Tuesday December 2, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway
 
Wednesday December 3, 2025
12:00 AM - 11:59 PM    Lights in the Parkway Lehigh Parkway
 
12:00 AM - 11:59 PM    Capital Project Updates - Bogerts Bridge Construction
Our community is undertaking key capital projects to enhance parks, recreational spaces, and outdoor facilities. These efforts aim to improve quality of life, support healthy lifestyles, and strengthen community connections as our region grows. Current projects include developing new park spaces, renovating existing areas, and enhancing walking and biking trails with improved accessibility, seating, and clear signage. These improvements will encourage outdoor fitness and provide safe, connected routes for everyone.Current & Upcoming Projects Project Name: Parks Master PlanDraft Plan Public Review Period:Overview: Help shape the future of our parks! As part of our Parks Master Plan, these initiatives align with long-term goals to create vibrant, sustainable spaces that meet the needs of our growing population. Your input is vital in shaping the design, improvements, and amenities of local parks.  Project Name: Jordan Park Skatepark Phase 2Dates: Main Construction is complete, some remaining items still need to be completed.Overview: The Jordan Park Skatepark Phase 2 Project involves completing the skatepark by installing the remaining features. This project aims to provide a high-quality facility with features for both beginners and advanced skateboarders, bikers and other wheeled sports. By completing this phase, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: D&L Trail DesignDates: Currently in the Design PhaseOverview: The D&L Trail project involves the design and construction of a multi-use paved trail from the existing trail head on N Bradford St, following on street routes to N Dauphin St, continuing through Kimmett's Lock, and extending to the city boundary line, where it will connect with the D&L Trail in Hanover Township. This project aims to provide a trail for recreational use and as a commuter trail for those who travel by means other than car.Take the SurveyProject Name: Bogert's Bridge RehabilitationDates: Construction has started September 15th. Anticipated completion Aug 2026.Overview: This project includes the rehabilitation of Bogert's Covered Bridge over Little Lehigh Creek and other miscellaneous construction within the Lehigh Parkway. Rehabilitation includes lifting of the existing bridge with a crane to correct its sag, replacing any damaged timbers, installing a new slate roof, and repainting the bridge to restore it back to original appearance.Project Name: Roosevelt ParkDates: Improvements to start Fall 2025.Overview: This project includes the demolishing the existing pool house building (by the tennis courts) which is in poor condition, and constructing a new pavilion near the playground and basketball courts. Take the SurveyProject Name: Mack Pool RenovationsDates: TBD - applying for a grantOverview: The Mack Pool Renovations project includes removing the existing baby and middle pools, replacing them with a zero-depth entry splash pool, and repairing the existing lap lane pool in the same location. We are currently collecting public feedback on which of the two design options residents prefer. This is needed as we are applying for a grant to be able to complete these renovations. The grant will potentially cover design and construction, so there will be more opportunities to provide feedback during the design phase. Help us shape the future of Mack Pool!Review the two design options below and share your feedback using the survey link.Option 1:Option 2: Take the SurveyProject Name: Urban ForestryDates: Master Plan started in September. Tree Plantings TBD.Overview: This project includes an Urban Forestry Master Plan, Tree Inventory and Species Selection for street and park trees. Goals include increasing tree canopy, improving air quality, and reducing heat in urban areas. As part of a USDA and American Forests grant, we'll also plant more than 300 trees in under served neighborhoods.Project Name: Franklin Park DesignDates: TBDOverview: This project includes the design of Franklin Park. A consultant has been selected and will begin once the contract is finalized.Completed ProjectsProject Name: Dixon Street Pedestrian BridgeCompleted September 10, 2025.Overview: The Dixon Street Pedestrian Bridge project includes removing the existing damaged pedestrian bridge, creating new abutments, installing a new prefab pedestrian bridge and refinishing the asphalt paths on both sides of the bridge. This will reconnect neighborhoods and provide a safe crossing for the children who utilize this bridge to get to school.Project Name: Stevens Park Full Size Basketball Court Coming SoonCompleted July 18th, 2025.Overview: Installation of a new full-size basketball court to complement the park's existing recreational facilities. This project aims to provide a high-quality, flexible space for both casual play and competitive games. By adding the full-size court, the park will offer more opportunities for the community to engage in sports activities, while enhancing the overall amenities of the park.Project Name: Soccer Mini-Pitch to be Installed at Jordan MeadowsCompleted April 29th, 2025.Overview: This project transformed an underused hockey rink at Jordan Meadows Park into a new 60’ x 120’ Soccer Mini-Pitch. Featuring LED lighting, seating, and lockable storage, the space offers safe, accessible recreation for youth in a high-poverty neighborhood. As part of Allentown's Vision 2030 plan, the mini-pitch supports free youth sports programming that promotes physical activity, teamwork, and mentorship. It also serves as a positive outlet to help reduce crime and strengthen community connections.
Lehigh Parkway